ConocoPhillips Alaska Home Page
ConocoPhillips  |   Jobs  |   ArcticEnergy  |   Environmental  |   Permits  |   Pipeline Tariffs  |   Vendors
 tariffs home

 TAPS
 Kuparuk
 Alpine
 Oliktok

 contact
Oliktok Pipeline Company
Overview
ConocoPhillips is a 100% owner of Oliktok Pipeline Company (OPC). The Oliktok pipeline is approximately 28 miles in length having an outside pipe diameter of 16 inches. The system is located on the North Slope and runs parallel to the Kuparuk pipeline. Currently, OPC transports approximately 22,000 barrels per day of NGLs from the Prudhoe Bay field to the Kuparuk and Milne fields for reinjection to aid in oil recovery.
2010
Oliktok 2010 Effective date and rate.pdf
OPC 2010 Supplemental Tariff Filing #2.pdf
OPC 2010 Supplemental Tariff Filing.pdf
OPC 2010 Tariff Filing.pdf
RCA TL35-334 L1000022.pdf
2009
OPC RCA Tariff Advice Letter TL33-334 2009 Tariff.pdf
2008
Oliktok RCA 2008 Tariff.pdf
2007
Oliktok 2002 Rules and Regs.pdf
Oliktok Rates 2007.pdf
Past Tariffs
Oliktok 2005 Tariff.pdf
Oliktok 2006 Tariff.pdf
Oliktok Transmittal Letter.pdf
OPC 2003 Tariff.pdf


© 2009 ConocoPhillips. All rights reserved. Legal, Privacy & Security Notices. Updated 12/18/2009.